Modbus TCP / BACnet IP to WAN MQTT Gateway

GT200-MQ-BMT

GT200-MQ-BMT Quick Start Guide

Product Appearance

Wiring

  • 1. 1.35mm DIN Rail Installation.
  • 2. Connect the gateway power interface to the power supply.
    Pin Function
    1 Power GND
    2 NC(Not Connected)
    3 24V+,DC Positive 24V
  • 3. Connect the Gateway’s RJ45 interface to the computer with a RJ45 cable.
  • 4. Power on the gateway. Run the SST-BMQ-CFG to start the gateway configuration.

LED Status Indicators

Indicators Function
MQ/N1 (Top Left) Network status of MQTT and EtherNet 1
BI/N2 (Top Right) Network status of BACnet IP and EtherNet 2
MS (Bottom Left) Module Status
MT (Bottom Right) Network status of Modbus TCP

 

Indicators Status Description
MQ/N1 Solid Green MQTT connection established
Flashing Green Attempting to establish MQTT connection or connection disconnected
Flashing Red DHCP (EtherNet 1)
Flashing Red The IP address of EtherNet 1 is in the same subnet as EtherNet 2
BI/N2 Solid Green BACnet IP connection established
Flashing Green Attempting to establish BACnet IP connection or connection disconnected
Flashing Red DHCP (EtherNet 2)
Solid Red The IP address of EtherNet 2 is in the same subnet as EtherNet 1
MS Solid Green Startup
Flashes Green Two times, then Off Restore factory settings through the button
Solid Red for 500ms Configuration is locked
Solid Red and off alternatively Configuration is unlocked
Solid Red Gateway Failure
Solid Orange Initialization
MT Solid Green Modbus TCP connection established
Flashing Green Attempting to establish Modbus TCP connection or connection disconnected
Flashing Red Reserved
N1 Orange and N2 Orange All On Startup Status
Alternate Flashing for 3s Locating the gateway

Software Configuration

  • 1. Run the SST-BMQ-CFG software installed on your computer.
  • 2. DoubleClick "BACnet IP" in the tree view on the left, set the Network and BACnet IP communication parameters. Remember: Two Ethernet cards cannot be set to the same subnet
  • 3. Double Click "Modbus TCP" in the tree view on the left and set the Modbus TCP protocol communication parameters.
  • 4. Add node and commands under the "Modbus TCP".
  • 5. If you need to upload the collected data to MQTT, you can configure the corresponding parameters and add mapping relationships in "Fieldbus to MQTT". The MQTT function can only use network card 1 for communication.
  • 6. You can add mappings in the"Fieldbus to Fieldbus" for BACnet IP and Modbus TCP conversion.
  • 7. Click download button, select the correct serial port number and then click on "Download".
  • For more information, please refer to the GT200-MQ-BMT manual.

Communication Instructions

  • 1. Connect BACnet IP client or Modbus TCP devices to the gateway's Ethernet interface. Please refer to the gateway manual for specific connection methods.
  • 2. Observe the indicator lights to check the communication status.